About the Downtown Traffic and Cycle Tracks Studies
Study to propose a preferred alignment and design for physically separated bicycle lanes ("cycle tracks") in the Richmond-Adelaide Corridor, from Bathurst Street to Sherbourne Street. In addition, evaluate and recommend the preferred alignment and design for north-south cycle tracks, between Peter and Simcoe Streets, connecting the proposed Richmond-Adelaide Corridor cycle tracks to existing bikeways to the north (Beverly Street north of Queen Street) and to the south (Simcoe Street south of Front Street).
